Files
nomad/website/content/docs/commands/node
Tim Gross 9d5c7b5d94 CSI: node drain should end once only plugins remain (#12846)
In #12324 we made it so that plugins wait until the node drain is
complete, as we do for system jobs. But we neglected to mark the node
drain as complete once only plugins (or system jobs) remaining, which
means that the node drain is left in a draining state until the
`deadline` time expires. This was incorrectly documented as expected
behavior in #12324.
2022-05-03 10:20:22 -04:00
..